[Customer Case Study] Electric Works Company, Panasonic Corporation
A case study demonstrating how toilet occupancy visualization helps create a more accessible and user-friendly restroom environment for everyone.
An occupancy indicator has been installed in a location that is clearly visible from the entrance to the first-floor cafeteria, allowing users to quickly see whether any restroom stalls are available. In addition, the occupancy status of each stall is projected onto the wall near the washbasin area, enabling users to check availability before entering the restroom area. Indicator lights are also installed at each stall door, making it easy to confirm occupancy status from a distance. By providing clear and accessible information on restroom availability, the system helps create a more convenient and inclusive restroom environment for all users. Case Study Overview ■ Installation Location: “Minna no Toilet” on the first floor of the new employee welfare facility, CultureBase. ■ Background: A need for restrooms that are easy and comfortable for a diverse range of users to use ■ Design Approach: The circulation and information display were designed so that wheelchair users and others can check availability smoothly without waiting unnecessarily Search Keywords Restroom occupancy display, toilet vacancy display, restroom availability display, restroom occupancy management, restroom congestion visualization, restroom DX, smart restroom, accessible restroom, universal design, occupancy visualization, vacancy indicator, occupancy display system, digital signage, facility guidance system, convenience, facility operation support, facility management system, commercial facility DX, visitor guidance, usage time display, prolonged occupancy detection, restroom usage analysis, utilization rate analysis, congestion reduction
- Company:セイコータイムクリエーション
- Price:Other